Product Brand


GE MS5001 GAS TURBINE FRAMES

GE MS5001 GAS TURBINE FRAMES

GE MS5001 GAS TURBINE FRAMES

Product ID [EQUIP2894]

Request a Quote

We are so proud to announce that we are becoming one of the main sources for first and second stage buckets for Frame 5 which is one of our most successful supply chain managing projects. We have exceeded over 100 sets of these buckets and they have already been installed on different gas turbines all around the world. Our competitive pricing as well as OEM equivalent quality of these parts made us as one of the most reliable suppliers of these parts in the world.

Other parts which we are ready to supply are:

Complete rotors as well as individual turbine wheels for different hot or cold section

First and second stage nozzles

Instrumentations such as servo valves, flame detectors, check valves, fuel pumps, etc.

Compressor blades

Tie Bolts

And all flange to flange spare parts for both MS5001PA and MS5001NT gas turbine

  
Model Number: MS5001
Brand Name: GE GAS TURBINE
Color: Painting per customer requirement
Applications: Power, Oil Gas Delivery, PetroChem, Marine, Hydraulic Unit
Condition: New
Certification: ASME, API, ISO, EX, CE
  
Delivery Time: 4-30 Weeks
Packaging Details: Crate
Product Size
Weight
Width
Length
Height

lbs
in
in
in